Re: JBA's ordered

From: Mike Catlin (Catlin@erols.com)
Date: Mon Jul 27 1998 - 14:37:21 EDT


Well just ordered my JBA headers today Jeff said I was the 25th DMLer
to order. Ordered mine with the ceramic coating. He said just
about everybody ordered the coating. Jeff also said they are working
on down pipes for the R/T using Bruces R/T. By the way Bruce my
R/T has the 2 pipes going into the cat using clamps and was manufactured
on 3-98 (Jeff was curios if the cat was welded or clamped). He said
I should receive them 1st or 2nd week in August.

Mike Catlin



This archive was generated by hypermail 2b29 : Fri Jun 20 2003 - 12:09:11 EDT