andylevy@yahoo.com wrote:
> I did some more math, and I don't think it's gonna happen.
> The pavers are about 1200 pounds. It'll be pushing it, but if I remove all the
> seats and load evenly, I'd be OK. Borderline, but manageable.
> The stone that needs to go underneath the pavers, however, will come in around
> 2 tons - I'm figuring 21 cubic feet, 42 bags, at 50+ pounds each.
> Either 2 trips, or I rent something, or I have them deliver. Going to ask about
> delivery - if they can't get to it before noon, not a problem, we have plenty
> of excavation to do first (about 1.2 cubic yards worth).
> Or you could loan me your 3500 :)
Yep, all of the above can be hauled in one trip with the 3500. Gots
to love a 5,000lb payload. :-) Might have to unsnap the tonneau
cover though. (sigh...) ;-)
-- -Jon-.- Jon Steiger -- jon@dakota-truck.net or jon@jonsteiger.com -. | '96 Kolb Firefly, '96 Suzuki Intruder, Miscellaneous Mopars | `-------------------------------- http://www.jonsteiger.com --'
This archive was generated by hypermail 2b29 : Thu Nov 01 2007 - 00:07:06 EDT