At 01:18 AM 6/13/97 -0500, you wrote:
>
>The guy that did it wasn't in a hurry but once they got to mine and
>started tying it down about 30 min. It could be done faster, but with
>no other cars being dynoed the shop wasn't in a hurry to get me out.
>Once he warmed the engine up and started to do the runs, it took all of
>2 minutes, the rest was preparation, printing out the graphs, and
>setting up the dyno.
>--
>Michael Clark mike@snakebite.com
> 93 Mark III 4X2 reg. cab SWB
> V8 auto MP SBEC K&N FIPK
>
The place local to me wants $100 for a 2 pull Basic Run. I think I'll wait
until they can bring the price down a bit first.
*******************************97 Dakota Sport*******************************
sean meldrum
email: Home: spm@c3net.net (list subscription)
Work: sean_p_meldrum@auto.ittind.com
Black, 318, 5spd, 3.55SG, reg. cab, 2wd, buckets
"Fresh air by Meldrum"
All exterior vinyl graphics removed
Moroso Blue Max plug wires and Spectre looms
Cherry Bomb Turbo II exiting b4 axle (temporary)
MSD 6a, Blaster coil awaiting installation
****************************************************************************
****
This archive was generated by hypermail 2b29 : Fri Jun 20 2003 - 12:07:44 EDT