Re: hotchkis kits(Gary)

From: Ryan D. Krokosinski (eqgroup@equinoxfinancial.com)
Date: Tue Feb 16 1999 - 14:03:04 EST


Hey Gary,
Do you have any pricing info on this stuff yet.

Ryan K
'99 R/T RC

Gary Pinkley wrote:

  I've got everything approved and ordered.  Springs will be 2-4 Wks (Coils 2, Leafs 4), Swaybars are looking about 6 wks (HUGE backorder for bars).  The kits are a lot later than I wanted, but I also didn't want to sell anything that wasn't right.  Uprated swaybars are a difficult fit when you lower the dak.  There just isn't much room for anything, I really had to play with the geometry to get the bars to fit properly.  BTW, the Silverado ads hit about 3 wks before the parts are ready as well.  Magazines run on ~ three month lead time, so you have to gamble with the timing.-Gary <I saw that Hotchkis has already released its sports handling spring set for
<the 99 chebbies.
<How are we doing on the Dakota release?



This archive was generated by hypermail 2b29 : Fri Jun 20 2003 - 12:12:36 EDT