Re: hotchkis kits(Gary)

From: Gary Pinkley (gapinkley@earthlink.net)
Date: Fri Feb 12 1999 - 21:16:55 EST


I've got everything approved and ordered. Springs will be 2-4 Wks (Coils 2, Leafs 4), Swaybars are looking about 6 wks (HUGE backorder for bars). The kits are a lot later than I wanted, but I also didn't want to sell anything that wasn't right. Uprated swaybars are a difficult fit when you lower the dak. There just isn't much room for anything, I really had to play with the geometry to get the bars to fit properly. BTW, the Silverado ads hit about 3 wks before the parts are ready as well. Magazines run on ~ three month lead time, so you have to gamble with the timing.
-Gary

<I saw that Hotchkis has already released its sports handling spring set for
<the 99 chebbies.
<How are we doing on the Dakota release?



This archive was generated by hypermail 2b29 : Fri Jun 20 2003 - 12:12:35 EDT